This Old House
Touring the Atlanta BeltLine; replacing the existing footings with a stem wall; adding a vapor barrier to a crawl space; a lesson on HVAC installation; touring an outdoor learning center.Start: 2026-09-19-150000
end: 2026-09-19-153000
This Old House
Putting up new framing; installing ductwork; exploring native fruit trees; cardboard boxes make for a real kitchen feel; restoring old windows.Start: 2026-09-19-153000
end: 2026-09-19-160000
This Old House
Progress is made on the interior and exterior of the house; bevel pine siding is woven into the old; touring Tyler Perry Studios; adding lightning and surge protection; the Dracut Centre School restoration is completed.Start: 2026-09-19-160000
end: 2026-09-19-163000
This Old House
The old details of the home are respected; new porch columns are made to match the old; a bathroom gets a concrete-like finish; installing a reclaimed front door; visiting Dr. Martin Luther King Jr.'s birth home.Start: 2026-09-19-163000
end: 2026-09-19-170000